A stand drawn for one brief and one floor plan

We start from the hall plan, your stand number and what you need visitors to do. Then we draw, build and trial-assemble the whole stand in our workshop before it travels. Nothing reaches the hall that hasn’t already stood up once.

S-01

Custom stands · 24–400 m² · 10–16 weeks

Peninsula stand with a glass-walled demo room at its centre, seen from the aisle

Corvane Medical · 96 m² peninsula · 3 build days

Corvane Medical · 96 m² peninsula · 3 build days

Who it’s for

Who it’s for

Exhibitors with a flagship show, a product launch, or a stand that needs to do something unusual: hold a working machine, carry a mezzanine, host a demo theatre, or seat forty people for a talk.

What’s included

What’s included

8 parts

1×

A site visit or hall-plan review, and a kick-off workshop with your team

2×

Concept visuals, then a developed 3D model with two rounds of changes

3×

Construction drawings and structural calculations for the organiser’s approval

4×

Graphics templates and a clear artwork deadline

5×

Joinery, metalwork, paint and fabric print in our workshop

6×

A full trial build on our floor, photographed for your sign-off

7×

Transport, build-up crew and a show-day technician on call

8×

Dismantle, and storage for anything worth keeping

Typical lead time and size

Typical lead time and size

Lead time

Lead time

10–16 weeks from signed proposal to opening day. We can go faster; we’ll tell you what that costs before we start.

Size range

Size range

24–400 m², inline to island, single or double deck.

FAQ

FAQ

4 answers

01

Can we reuse parts of a custom stand?

Can we reuse parts of a custom stand?

Yes, and we’ll plan for it from the first drawing. Counters, walls and light boxes can be made to our standard panel grid, so they go into storage and come out for your next show or into a modular kit.

02

Do you handle double-deck stands?

Do you handle double-deck stands?

Yes. Two-storey stands need earlier approval from most organisers, so add four weeks to the timeline and expect a structural engineer’s sign-off in the drawing package.

03

What if our stand number changes after we’ve started?

What if our stand number changes after we’ve started?

It happens. If the footprint and open sides stay the same, it’s usually a drawing update. If they change, we’ll re-plan the layout and tell you the cost before we cut anything.

04

Can we see the stand before it ships?

Can we see the stand before it ships?

Yes. Every custom stand is built in full on our trial floor. You’re welcome to walk it with us, or we’ll send a photo set and a video walk-through.

Bring us the floor plan.

Create a free website with Framer, the website builder loved by startups, designers and agencies.